Formulary Tracker (TFM) — Rescue: failing project to ahead of schedule

Problem.

Formulary Review Committee (FRC) decisions were coordinated by hand: requests, drug-level grid edits, and cross-team questions moved through spreadsheets and email with no system of record or audit trail. The replacement project I inherited was high-risk and failing, held back by major technical bottlenecks and no shared engineering standards.

Solution.

A two-tier system: an Angular SPA over a Spring Boot API that owns FRC workflow state, with every change auditable.

  • Workflow API. Java 21 / Spring Boot REST service (/api/v1) on PostgreSQL with Flyway migrations and Hibernate Envers history. It runs the FRC lifecycle (create, submit, approve, cancel, admin override), batch grid saves with optimistic concurrency, and cross-team Q&A with attachments.
  • Editable grid. Angular 20 standalone components, signals, and OnPush, with an AG Grid Enterprise grid that has column config in the database and a single computeFrcCapabilities() source of truth for UI enablement.
  • Integrations. MyPBM (users, teams), Medi-Span/NDC and Caremark drug search, Azure Entra ID, Key Vault, and SMTP notifications. An AI-assisted matcher handles Decision Tracker imports, and feature flags and kill switches guard risky features.
  • Auth. OIDC PKCE on the front end and OAuth2 resource server on the back end, with additive roles (VIEW_ONLY < VIEW_AND_EDIT < APP_ADMIN) plus team membership.
  • Platform. Helm/Istio deploys through dev -> qa -> reg -> uat -> pt -> prod. Runtime environment.json overrides let one build serve every environment.

Impact.

~$1.5M in yearly savings, delivered ahead of schedule.

The fun challenge

Rescuing a failing project in flight on a brand new team with new leadership who has yet to start with the company. I restructured the team around clear ownership of the front end, back end, and integrations. I defined the engineering standards (architecture conventions, PR review gates, test coverage checks, vulnerability scanning in CI) that made delivery predictable. Then I removed the bottlenecks one at a time: four legacy and enterprise integrations to stabilize, an editable grid under concurrent multi-user edits, and eight environments to keep consistent. Standards first, features second is what turned a slipping schedule into an early delivery.

Relfection

This project. This project right here was what catapulted me and pushed me in way thats I have not had to navigate before. Sadly I burned a lot of political capital on this project but it was time, and reflecting on that, worth it.